Skip to content

Delay differential equations

The compiler supports the SBML MathML delay function in expressions, rules, initial assignments, and events. A model such as

dx/dt = delay(x, 1)
x(t) = 1 for t <= 0

has x(1) = 2, x(2) = 3.5, and x(3) = 37/6. Encode delay as the SBML csymbol, followed by the expression and duration:

<apply>
  <csymbol encoding="text"
    definitionURL="http://www.sbml.org/sbml/symbols/delay">delay</csymbol>
  <ci>x</ci>
  <cn>1</cn>
</apply>

Simulation requests and results use the same API as ordinary ODE models. Prepared requests, repeated simulations, native execution, Wasmtime, and JavaScript execution support delays.

History and initialization

The first operand is evaluated at the historical time, including historical state, parameters, assignment rules, and compartment sizes. The duration is evaluated in the calling context. Nested delays therefore use the historical context of the outer delay. A zero duration evaluates the current solver state. Durations must be finite and nonnegative; invalid values return an integration error with flag -1006.

Before time zero, initial values and initial assignments define history according to the SBML specification. Assignment rules still apply at the queried time. The prehistory evaluation computes only dependencies of the delayed expression. Request pre-initialization values override the corresponding initial values. rateOf is zero before time zero.

Historical algebraic unknowns are reconstructed by solving their dependency-closed constraints at the queried time. The projection uses scaled finite differences, pivoted elimination, and damped Newton iteration. An infeasible constraint or a failure to converge returns flag -1006. Projection code must fit the compiler's function budgets. Simulations starting before zero use their integrated history once the requested time lies inside the retained trajectory.

Events and request changes retain both sides of a history discontinuity. A query exactly at the discontinuity uses the updated value. Steady-state phases retain their history when the following timecourse resets its clock.

Integration

The DDE path retains the CVODE or IDA dense polynomial for each accepted solver step, together with parameter epochs. Output grids do not determine history resolution. Delayed discontinuities are located with solver roots, including variable and reversing durations, so a narrow delayed pulse can be resolved even with sparse requested output times. Discontinuities propagate through derivative order 12.

Queries inside the current trial step use bounded iteration of its continuous extension. The engine retries or shortens a step when the history has not converged. It does not impose a step-size ceiling equal to the shortest delay. Very small delays therefore need not force correspondingly small steps.

DDE models use a colored finite-difference Jacobian because a current state can also affect a historical query time. Explicitly requesting an analytic Jacobian for a DDE model is rejected. Solver step budgets and execution deadlines still apply. History storage is bounded to 1 GiB, and nested evaluation to 128 frames; exceeding a history limit returns flag -1006.

Retained history

The compiler bounds how far back a model can read when every duration of a delay is a finite nonnegative constant: the bound is the longest chain of nested durations, max_delay of the description. The engine then drops the accepted steps older than twice that bound and rebuilds its arena without them, so the memory of a run grows with the longest delay and not with the horizon. The arena has to double before it is rebuilt again, so the work of the compactions of a run stays proportional to its steps.

A duration which depends on the state or on the time has no bound, so such a model keeps every accepted step and its history grows with the horizon. Give the delays constant durations where the model allows it.

The measured effect on a chain of 20 Mackey-Glass equations with a delay of 2, integrated to t = 6400 at relative_tolerance 1e-9, is a peak resident size of 17 MB instead of 1638 MB, and 2.65 s instead of 3.51 s. The same model without the bound fails with flag -1006 once its history outgrows its room.

Ordinary ODEs

Models without delay keep their existing compiled module and description bytes. The solver selects the DDE path once per model. Ordinary ODE integrators use a zero-sized history type, without history allocation, recording, or lookup in solver callbacks. The DDE history ABI is an optional model custom section.

In the fixed comparison against the preceding engine, 10 of 48 ordinary ODE workloads showed a slowdown, seven showed a speedup, and 31 were inconclusive. The largest measured slowdowns were 3.90% for native prepared Robertson with KLU and 2.30% for prepared Adams on WASM. Three baseline controls also showed timing differences. The retained implementation did not meet the zero-overhead criterion. Performance results and simultaneous confidence intervals

Validation

All 53 prepared SBML Test Suite delay cases pass with optimization enabled and disabled and with the difference Jacobian option. The complete suite passes 1,754 of 1,789 cases. The remaining 35 require unsupported fast reactions. Additional integration tests cover nested, zero, state-dependent, and tiny delays, prehistory, concentrations, events, narrow pulses, prepared replay, steady-state phases, negative starts, algebraic prehistory, invalid durations, and step budgets, including rejected overlapping trials.